beautypg.com

Ipt122 series – Brooks Instrument IPT122 2 Indicating Pressure Transmitters" User Manual

Page 14

background image

Installation and Operation Manual

X-PR-IPT122-eng

Part Number 541B151AAG

April, 2010

2-4

Section 2 Installation

IPT122 Series

2-9 IPT122 Electrical Installation

Refer to Figures 2-1 through 2-3 for electrical connections.

3.

Prepare the pressure transmitter for use

A. Verify integrity of the seal by appropriate helium leak-testing

procedures.

B. Turn the gas flow ON then OFF, 10 times to remove any particles

generated during installation. (The flow rate used should at least equal
the process flow specifications.)

C. Mechanical Installation is complete. Complete electrical connections as

noted in the next section.

Figure 2-1 IPT122 Bottom and Side Views