Ipt122 series – Brooks Instrument IPT122 2 Indicating Pressure Transmitters" User Manual
Page 14

Installation and Operation Manual
X-PR-IPT122-eng
Part Number 541B151AAG
April, 2010
2-4
Section 2 Installation
IPT122 Series
2-9 IPT122 Electrical Installation
Refer to Figures 2-1 through 2-3 for electrical connections.
3.
Prepare the pressure transmitter for use
A. Verify integrity of the seal by appropriate helium leak-testing
procedures.
B. Turn the gas flow ON then OFF, 10 times to remove any particles
generated during installation. (The flow rate used should at least equal
the process flow specifications.)
C. Mechanical Installation is complete. Complete electrical connections as
noted in the next section.
Figure 2-1 IPT122 Bottom and Side Views
See also other documents in the category Brooks Instrument Hardware:
- QMBC (52 pages)
- SolidSense II (28 pages)
- SLA7810/20 (36 pages)
- SLA5810/20 (50 pages)
- SLA5840 (46 pages)
- SLA7840 (40 pages)
- 5866E (65 pages)
- IPS122 2 Indicating Pressure Switches" (18 pages)
- 8601 (20 pages)
- PTI Metal Seal Mass Flow Controller w/Real-Time Flow Error Detection & Advanced Diagnostics (82 pages)
- SLA5800 Series (76 pages)
- 5800S Series (50 pages)
- 4800 Series (50 pages)
- 5850EM (74 pages)
- 5851EM (62 pages)
- 5850E (64 pages)
- 5851E (64 pages)
- 5860E (46 pages)
- 5861E (44 pages)
- 5850i (62 pages)
- 5851i (62 pages)
- 5860i (48 pages)
- 5861i (48 pages)
- 5881/91 (40 pages)
- GF40 (78 pages)
- SLAMf Series (76 pages)
- Mfi Series (82 pages)
- 0254 (124 pages)
- 0260 (14 pages)
- CMC Series (36 pages)
- XacTorr CMX45 (64 pages)
- MT3809G (78 pages)
- MT3809E (72 pages)
- MT3810 (66 pages)
- 3600 Series (56 pages)
- 3750 (64 pages)
- Control Valve (16 pages)
- GT1000 (52 pages)
- 1100 Series (52 pages)
- 1307 (18 pages)
- 1358 (44 pages)
- 1350 (46 pages)
- 1250 (2 pages)
- FC8800 Series (48 pages)