beautypg.com

DE DIETRICH NEO 2.1 User Manual

Page 50

background image

n Waterproofing the connection between the 3

collectors (lower)

1. Leave the BUTYL strip loose at the end of the intermediate clips.

Squeeze silicone on to the joints between the mounting

components.

2. Coat the inside of the central junction section with silicone.
3. Put the central junction section in place.
4. Coat the sections with silicone.
5. Fold the BUTYL strip back on to the junction section.
6. Secure the junction section.

C003924-B

2

4

5

6

6

3

1

4. Installation

NEO 2.1 / SUN 211

49

20/02/2013 - 300024195-001-02