beautypg.com

DE DIETRICH NEO 2.1 User Manual

Page 39

background image

n Positioning the solar collectors

1. Screw the lower fastening lugs onto the bottom batten.
2. Position the collectors. The fastening lugs must be fitted into the

holding groove.

3. Postion the upper fastening lugs in the holding groove on the

collectors and screw them onto the batten.

The solar panels should only be installed shortly before the solar-

heating system is to be commissioned. This will minimise the time that

the solar panels are exposed to heat while not filled with heat-

transporting fluid.

C003456-F

66

0

40

0

20

0

mi

ni

66

0

1

2

3

3

3

3

3

1 2

1 2

1 2

1 2

80

165

NEO 2.1 / SUN 211

4. Installation

20/02/2013 - 300024195-001-02

38