DE DIETRICH ELITEC DTG 130 Eco.Nox User Manual
Dtg 130 eco.nox, Elitec, Installation and service manual
Table of contents
Document Outline
- Declaration of conformity S
- Contents
- 1 Introduction 5
- 2 Safety instructions and recommendations 8
- 3 Technical description 9
- 4 Installation 14
- 5 Commissioning 24
- 6 Switching off the boiler 28
- 7 Checking and maintenance 29
- 8 Spare parts - DTG 130 Eco.NOx 35
- 1 Introduction
- 2 Safety instructions and recommendations
- 3 Technical description
- 3.1 General description
- 3.2 Technical characteristics
- 3.3 Main parts
- 1. Safety box: Mounted on the gas block to ensure and check ignition sequences, plus burner operation and extinguishing sequences.
- 2. Gas regulation block: It has a progressive opening, regulation valve and safety valve in series which is controlled by the boiler adjustment dial.
- 3. Gas inlet
- 4. Burner
- 5. Flame inspection window
- 6. Ignition electrode: This ensures ignition burner ignition using a high voltage spark.
- 7. Ionization probe: This detects the presence of a burner ignition flame through ionization.
- 8. Ignition burner
- 9. Ignition burner gas supply pipe
- 10. Downdraught thermostat (located on the rear wall of the anti- blowback device) In the event of smoke release, the burner is ...
- 11. Sensor tube
- 3.3 Main parts
- 3.4 Operating principle
- 4 Installation
- 4.1 Regulations governing installation
- 4.1.3 Switzerland
- 4.3 Mounting
- 4.3.1 Position of the boiler
- 4.3.2 Ventilation
- 4.3.3 Main dimensions
- DTG 130 Eco.NOx
- DTG 1300 Eco.NOx/B 150 - Right
- DTG 1300 Eco.NOx/B 150 - Left
- DTG 1300 Eco.NOx/H 150
- 1. Heating flow R1 (1") for one single boiler G1 (1") for boiler with DHW tank
- 2. Heating return R1 (1") for one single boiler G1 (1") for boiler with DHW tank
- 3. Filling and emptying tap (connection for 14 mm interior diameter pipe)
- 4. Gas inlet ø K
- 5. Smoke nozzle ø B
- 6. Hot water outlet - R 3/4 (3/4")
- 7. Circulation - R 3/4 (3/4")
- 8. Cold water inlet - R 3/4 (3/4")
- 9. Drain cock (connection for 14 mm interior diameter pipe)
- 4.3.4 Assembling the appliance
- 9 2 bulbs (A): Use the contact spring
- 6 Attach the anti-release safety device onto the 3 connector studs on the control panel
- 4.4 Hydraulic connections
- 4.6 Connection to a chimney
- 5 Commissioning
- 5.1 Control panel
- 5.2 Check points before commissioning
- 5.3 Commissioning procedure
- 1. Check the water pressure in the installation. Top up with more water if necessary.
- 2. Open the gas valve.
- 3. Check that the safety thermostat has not triggered. Remove the safety thermostat hood and press the reset button with a screwdriver.
- 4. Set the On/Off switch to K.
- 5. Make the settings on the control panel
- 5.4 Gas settings
- 6 Switching off the boiler
- 7 Checking and maintenance
- 8 Spare parts - DTG 130 Eco.NOx