DE DIETRICH C 310 ECO - C 610 ECO User Manual
User guide
Table of contents
Document Outline
- Contents
- 1 Introduction
- 2 Safety instructions and recommendations
- 3 Description
- 2. Sensor tube for outlet temperature sensor
- 3. Flow connection
- 4. Connection for second return (optional)
- 5. Return connection
- 6. Filling and emptying tap
- 7. Condensates collector
- 8. Combusted gas temperature sensor
- 9. Condensates discharge
- 10. Measurement point O2/CO2
- 11. Wheel
- 12. Setting bolt
- 13. Condensates evacuation pipe
- 14. Flue gas discharge duct
- 15. Inspection hatch
- 16. Reduction sleeve Ш250/Ш200 (Option)
- 17. Heat exchanger
- 18. Output sensor
- 19. Air intake
- 22. Gas connection
- 23. Flame inspection window
- 24. Ignition/ionisation electrode
- 25. Return sensor
- 26. Heating body sensor
- 27. Base frame
- 28. Pivoting castor
- 29. Fan
- 30. Venturi
- 31. Multivalve gas unit
- 32. Non-return valve
- 33. Differential air pressure switch
- 34. Gas filter
- 35. Air chamber
- 36. Control panel
- 37. Adjustment keys
- 38. Display screen
- 39. General ON K / OFF J switch
- 40. Button t
- 41. Combusted gas flue
- 42. Combusted gas valve
- 43. Combusted gas discharge connection with an integrated condensates collection device
- 4 Use of the appliance
- 4.1 Control panel
- 4.2 Display
- 4.3 Changing the settings
- 4.4 Stopping the boiler
- 2. Close the gas valve.
- 4.4.1 Precautions to take if there is a danger of frost
- 4.4.2 Precautions to take in the event of prolonged shutdown (one year or more)
- 4.5 Commissioning the boiler
- 4.5.1 Commissioning
- 2. Remove the casings on the inspection side
- 3. Open the main gas valve
- 4. Check the electrical connections, particularly the earth
- 5. Fill the boiler and the installation with water (minimum pressure 1.0 bar)
- 6. Bleed the heating installation
- 7. Fill the siphon with water
- 8. Check the connection of the combusted gas evacuation and the air inlet
- 9. Empty the gas inlet
- 10. Open the gas valve on the gas pipe to the boiler
- 11. Check the admission pressure of the gas PI
- 12. Check whether the gas connection is leak proof
- 13. Activate the electricity supply to the boiler
- 14. Activate the boiler ON switch
- 15. Operate the circulation pump and check the assembly position and the rotation direction
- 16. Set the boiler regulation according to the heating request
- 17. The boiler starts to operate
- 18. Check the gas seal control and the minimum gas pressure pressure switch (if need be)
- 19. Press the Reset key to return the boiler to "user level"
- 20. Heat the installation to around 80°C and then stop the boiler
- 21. Bleed the heating installation and Checking the hydraulic pressure
- 22. The boiler is now operational
- 23. Set the boiler regulation to the desired values
- 24. Switch the boiler on and fill in the label "Set to"
- 4.5.1 Commissioning
- 5 Checking and maintenance
- 6 Troubleshooting
- 7 Technical characteristics
- 8 Energy savings