beautypg.com

Caution – AAON M2-036 User Manual

Page 31

background image

31

Local codes may supersede or further place
restrictions on vent termination locations.




















Figure 4 - Service Access Clearance

Table 1 - Minimum Clearances

Unit Size

Minimum Required

Service Clearance

X =

M2-005 50”
M2-008 50”
M2-011 62”
M2-014 62”
M2-018 84”
M2-022 84”
M2-026 84”
M2-032 96”
M2-036 96”








Lifting the Unit
Units may be delivered in separate module
components or completely factory
assembled with all modules connected. In
the latter case, if the unit was received fully
assembled on a skid, then the equipment
should be lifted into place using the shipping
skid to prevent damage to the modules.







If cables or chains are used to hoist the unit
they must be the same length. Care should
be taken to prevent damage to the cabinet,
coils and condenser fans.

Before lifting unit, be sure that all shipping
material has been removed from unit. Secure
hooks and cables at all lifting points / lugs
provided on the unit.

Hoist unit to a point directly above the duct
openings.

Carefully lower and align the unit with
utility and duct openings. Make sure the unit
is properly seated and level.

Refer to the following unit lifting figures.

X

Coil

Energy

Recovery

Wheel

Module

Energy

Recovery

Wheel

Coil Module

Fan


Incorrect lifting can cause damage to
the unit.

CAUTION

This manual is related to the following products: