beautypg.com

Shock track installation instructions, Step 2 preparing surface for installation, Step 3 : determine number of rows – Bird B Gone Shock Track for Birds User Manual

Page 4

background image

SHOCK TRACK 

INSTALLATION INSTRUCTIONS 

Step 2 Preparing Surface for Installation: 

Remove all loose debris and bird droppings.  Surface 
should be thoroughly cleaned and disinfected using 
Bird­B­Gone’s Disinfectant DIS­SQ8. 

For Single Side Ledges/ Surfaces (i.e. ledges that 
have a back wall, window, etc.): 

1”  – 12” 

Use 1 Row   of Shock Track 

13” – 24” 

Use 2 Rows of Shock Track 

25” – 36” 

Use 3 Rows of Shock Track 

For Double Sided Ledges/ Surfaces (i.e. parapet walls, etc.), 
you will need to run a row on each side of the surface, as close 
to the edges as possible.  Use the following chart for the 
number of rows: 

1” – 4” 

Use 1 Row   of Shock Track on Each 

Side. 
4” – 15” 

Use 2 Rows of Shock Track on Each 

Side. 
16” – 28”  Use 3 Rows of Shock Track on Each Side. 

Step 3 :  Determine Number of Rows: