beautypg.com

Atec Teseq-Mil-Std416F-CS114 User Manual

Atec Equipment

background image

Teseq GmbH
Landsberger Str. 255 12623 Berlin Germany
T + 49 30 56 59 88 35 F + 49 30 56 59 88 34
[email protected]

www.teseq.com

1

NSG 4070 ApplicAtioN for Mil-StD 461f cS 114

Standards:

MIL-STD 461F CS 114

Frequency range:

10 kHz to 200 MHz

Curve 1 to 5:

see diagrams

Modulation:

1 kHz pulse modulation, 50%

duty cycle

Test method:

Substitution method with

monitoring probe

Monitoring probe:

only for information

Test parameter

Signal generation:

NSG 4070-0

Modulator:

included in NSG 4070-0

Power meter:

3x included in NSG 4070-0

Power amplifier:

max. 30 W required

RF Switch:

SW 4070

Directional coupler:

DCP 0100

Current injection probe:

CIP 9136A

Monitoring probe:

MD 4070

Calibration jig:

PCJ 9201B

Termination:

50 Ω 10 W

Attenuation:

1x 20 dB 30 W, 2x 10 dB 30 W, 1x

6 dB 30 W

Software:

incl. in NSG 4070 or optional C3I

or WIN 6000

Equipment

RF out

Amp in

< +10 dBm

Amp out

ch.1 < +27 dBm

ch.2 < +20 dBm

ch.3 < +20 dBm

Power meter

NSG 4070

Power

USB

Tuning

StSize

StSize

StSize

Local

Back

Stop

Run

Hold

0

.

1

4

7

8

5

2

3

kHz

dBm

6

9

MHz

dBµV

Hz

V

Enter

Step

1

STO

FRQ

LVL

RCL

Step

2

Step

3

MOD

2nd

Help

RF

ON/OFF

NSG 4070

Power meter

ch. 1 stress level

ch. 2 forward power

ch. 3 reverse power

Amp in

Amp out

50 Ω Termination

NSG 4070

RF output

NSG 4070

User port

Amp in

Amp out

Power amplifier

inputs

Calibration jig

MD 4070

Ground plane

Interlock

Switch (part of SW 4070)

Switch (part of SW 4070)

2

A

A

1

B

B

DIRECTIONAL COUPLER

Calibration set-up for monitoring probe

Remarks:
The monitoring probe MD 4070
needs to be calibrated in the way
of its use (active, passive or with
switching at a specific frequency
from active to passive).

WARNING: The power meter inputs are very sensitive. It is the user’s responsibility to ensure

that the selected test levels does not damage the equipment. Any hardware/setup changes
should be calculated before starting the test.