Alpha Technologies FlexNet PMR, GMR Series User Manual

Page 24

background image

24

031-239-C0-003 Rev C

Materials and tools:

Two customer-supplied pole straps to fi t pole

Assorted sockets

Procedure:

Unpack the enclosure and galvanized brackets; turn the enclosure facedown on
a soft surface.

Slide a bracket up through the enclosure’s lower mounting strap. The bracket’s
fl anges must face away from the enclosure. Secure the lower mounting bracket
using the 3/8” x 3/4” hex bolt included.

Position the upper mounting bracket on the pole and secure using a pole strap.

Lift the enclosure onto the upper mounting bracket and pull downward to properly
seat it. Center the enclosure on the pole.

Secure the lower mounting bracket on the pole using a pole strap. Spacing
between mounting straps for enclosures is: PMR-S1 is 25.24" on center. and
PMR-S2 is 30.0" on center.

The enclosure is now ready for the utility connection, power module and
batteries.

1.

2.

3.

4.

5.

6.

3.0 Installation,

continued

3.1

PMR (Pole Mount) Installation, continued

3.1.3 Enclosure on Steel or Concrete Pole