beautypg.com

Infinity Drain TDB Series Installation Instructions User Manual

Page 5

background image

5

Before finishing

material

Antes que el material

esté terminado

After finishing

material

Después que el material

esté terminado

7. Using desired floor material, mark the

thickness of the material along the outside

of the throat (B), so that it will finish 1/16”

above the channel. Spread thinset/mortar

bed up to the marked thickness. Ensure this

bed is pitched all directions toward the center

drain. If using a mortar build up, apply a

bead of silicone caulk around the throat after

mortar is dry. Lay finishing material, and have

material finish to the edge of the throat (B).

DO NOT allow finishing material to finish on

top of the stainless steel channel edge.

7. Usando el material del suelo deseado, marque el

espesor del material a lo largo de la parte exterior

del el cuello (B), de modo que termine 1/16” arriba

del canal. Propagación thinset/mortero hasta el

espesor marcada. Asegure que esto esté lanzado

en todas las direcciones hacia el drenaje del centro.

Si se construye mortero, aplique un cordón de

silicona alrededor del cuello después del mortero

cuando este seco. Coloque material terminado,

y tenga el material hasta el borde de cuello (B).

NO PERMITA que el material termine en la parte

superior del borde del canal de acero.

8. Remove the strainer (A) from the throat (B).
LTDB 5: Set finishing material of a thickness

up to 3/8” directly into strainer using thinset.
RTDB15/TDB15/TDB20: Set finishing material

of a thickness 3/4” directly into strainer using

thinset. If finishing material is less than 3/4”,

spread a layer of mortar into the top frame

of the strainer (A), allowing for thinset and

finishing material to finish 1/16” above the

metal frame. Allow to dry, spread thinset and

lay material. Place top frame of strainer (A)

back into the throat (B).

8. Remueva la parte (A) del cuello (B).
LTDB 5: Coloque el material terminado al

espesor de 3/8” directamente en la parte (A)

usando thinset.
RTDB15/TDB15/TDB20: Coloque material

terminado al espesor de 3/4” directamente a la

parte (A) usando thinset. Si el material esta menos

de 3/4”, propagación una capa de mortero en el

marco superior de la parte (A), permitiendo que el

thinset y el material esté terminado a 1/16” arriba

en el marco. Permita que se seque, propagación

thinsey y colocar el material. Coloque el marco de

la parte (A) de regreso al cuello (B).

Subfloor

Thinset/Mortar

Waste Line Pipe

Bonded Flange Drain Body

Mortar Bed

Liquid/Fabric Waterproofing

Finishing Material

Backer Board

Thinset

Mortar Bed

Sub-floor

Assurefinishing material is NOT installed

over edge of throat

Thinset

Liquid/Fabric

Waterproofing

Membrane