10.2 Replacing or Installing the Reagents

Reagent kits are available from Global Water Instrumentation for Free Chlorine and for
Total Chlorine Refer to section 11.0 Replacement Parts and Accessories for the
appropriate Catalog numbers. There

are two reagents required, and supplied in each kit;

the buffer

and the indicator.

The buffer and indicator reagents are provided as dry reagents and require the addition of
deionized water. You will need to have at least 1 liter of deionized water on hand prior to
preparing the solutions. Allow about ½ hour time to prepare the reagents.

Use caution while preparing. These reagents are caustic and can burn skin
and stain clothing. The use of protective gloves, clothing and eye protection is
highly recommended.

Buffer Reagent Preparation

Add about 400 ml of deionized water into the buffer bottle. Cap tightly and shake
vigorously until the powder is fully dissolved. When fully dissolved add enough deionized
water to bring the volume in the bottle up to the fill line.