beautypg.com

Asus P5GC-VM Pro User Manual

Page 22

background image

1-10

Chapter 1: Product introduction

3. Lift the load lever in the direction of

the arrow to a 135º angle.

4. Lift the load plate with your thumb

and forefinger to a 100º angle (A),

then push the PnP cap from the load

plate window to remove (B).

To prevent damage to the socket pins, do not remove the PnP cap unless you

are installing a CPU.

5. Position the CPU over

the socket, making sure

that the gold triangle is

on the bottom-left corner

of the socket. The socket

alignment key should fit into

the CPU notch.

2. Press the load lever with your thumb (A) and move it to the left (B) until it is

released from the retention tab.

Retention tab

Load lever

This side of the cam box

should face you.

PnP Cap

A

B

Load plate

A

B

Alignment key

Gold triangle mark