beautypg.com

1installation – Factory Direct Hardware Von Duprin 22EOF4 User Manual

Page 4

background image

911333_00(9) Page 4 of 12

RHR shown

LHR opposite

39-13/16”

to finished

floor

L

C

1.1. Mark centerline C location as shown in Figure 1-1.

1.2. For 299 or 299F strike: Tape strike template to frame

aligned with center line C as shown in Figure 1-2.
Mark and prepare mounting holes per template.

For 1409/1439 strike: Prepare frame as shown in Figure 1-3.

L

L

Figure 1-1

For double door, mullion is

already prepared for 499F strike.

Skip this step and go to Step #2.

NOTE

!

L

C

Figure 1-2. 299 or 299F Strike

Figure 1-3. 1409/1439 Strike

Template

For single door, prepare frame for 299, 299F, 1409/1439 strike.

1

INSTALLATION

7/8”

7/16”

7/16”

1-9/16” to

face of

door

Blade stop

7/8”

Cut -out

#25 Drill

#10-24 tap

1/8” Drill pilot

1” deep

Metal

W

ood

L

C

L

C