beautypg.com

Newport Brass 3-994TS East Square User Manual

Page 3

background image

I. Rough in Valve Installation
Note: Use plumbers tape or equivalent to seal all threaded port joints.
1. Do not remove mud cover from valve before locating mounting surface depth in the wall.
2. Do not turn the cartridge stem - temperature settings are pre-calibrated at the factory.
3. Install plug into one of the two outlet ports. Note: For proper valve operation only one

outlet port may be used.

4. Mount valve to cross support using shims and screws (not included). Valve shall be perpen-

dicular and fixed firmly to cross support to achieve proper trim attachment.

5. Place the cross support with valve between wall studs. The min./max. valve exposure tem-

plate on the mud cover and vertical height desired within tub/shower enclosure determines
the exact cross support placement. Attach cross support to wall studs.

6. Ensure opening in finished wall comes in contact with the mudcover to ensure seal with

Thermo Wall Plate shown in Fig. 4a. (See Fig 2a).

Plug

Shim

Fig. 1

Cartridge
stem

DO NOT TURN

Maximum exposure

Minimum exposure

Finished wall

Mud cover

Mud cover
template

W

al

l s

tu

d

Cross support

Fig. 2

NWP-1-540

Finished Wall

Opening in
Finished Wall

Mud Cover

Fig. 2a