beautypg.com

Newport Brass 15-03 User Manual

Towel ring

background image

Towel Bar / Towel Ring / Tissue Holder

Installation Instructions

Model No.

15-01, 15-02, 15-03, 15-09, 15-28

Recommended Installation by a Professional Contractor

1. Using the table below, measure the appropriate distance between post centers. See Fig. 1.

Note: Hole locations should be level.
· 18" Single Towel Bar - 18 1/8"
· 24" Single Towel Bar - 24 1/8"
· 30" Single Towel Bar - 30 1/8"
· Tissue Holder (2 Post) - 6 1/4"
· Tissue Holder (3 Post) - 6 1/4" (2x), See Fig. 2.

2. Drill hole(s) in wall at points marked using the appropriate drill size:

· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill

3. Dis-assemble END POST (6) from POST (3). See Fig. 5. Remove ESCUTCHEON (5) from

POST (3). See Fig. 4. Loosen SETSCREW (4) in FLANGE (1) and remove POST (3).
Fasten FLANGE (1) to wall using either WOOD/TOGGLE SCREW (2). See Fig. 3.

4. Engage POST (3) into FLANGE (1). Position POST (3) height to 2 5/16“ from mounting

surface. Secure POST (3) into place by tightening SETSCREW (4). See Fig. 3.

5. Thread ESCUTCHEON (5) onto POST (3). See Fig. 4.

6a. Towel Bars (Single): Assemble TOWEL BAR (7) between END POSTS (6). Place END

POST (6) onto POST (3) and secure into place with SETSCREW (4). See Fig. 5.

6b.

Towel Ring:

Slide END POST (6) onto POST (3) and secure into place

with SETSCREW (4). See Fig. 6.

6c. Tissue Holder (2 & 3 Post): Place END POSTS (6) onto POSTS (3) and secure into

place with SETSCREW (4). Place HOLDER (7) between END POSTS (6). See Fig. 7.

Distance between

posts

Fig. 1

Fig. 2

1

5

3

Fig. 4

Fig. 5

Fig. 7

6

4

6

4

7

6

6

3

Distance
between

posts

Distance
between

posts

Fig. 6

3

3

3

2 5/16”

4

4

6

3

Fig. 3

2

3

7