Newport Brass 15-03 User Manual
Towel ring
Towel Bar / Towel Ring / Tissue Holder
Installation Instructions
Model No.
15-01, 15-02, 15-03, 15-09, 15-28
Recommended Installation by a Professional Contractor
1. Using the table below, measure the appropriate distance between post centers. See Fig. 1.
Note: Hole locations should be level.
· 18" Single Towel Bar - 18 1/8"
· 24" Single Towel Bar - 24 1/8"
· 30" Single Towel Bar - 30 1/8"
· Tissue Holder (2 Post) - 6 1/4"
· Tissue Holder (3 Post) - 6 1/4" (2x), See Fig. 2.
2. Drill hole(s) in wall at points marked using the appropriate drill size:
· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill
3. Dis-assemble END POST (6) from POST (3). See Fig. 5. Remove ESCUTCHEON (5) from
POST (3). See Fig. 4. Loosen SETSCREW (4) in FLANGE (1) and remove POST (3).
Fasten FLANGE (1) to wall using either WOOD/TOGGLE SCREW (2). See Fig. 3.
4. Engage POST (3) into FLANGE (1). Position POST (3) height to 2 5/16“ from mounting
surface. Secure POST (3) into place by tightening SETSCREW (4). See Fig. 3.
5. Thread ESCUTCHEON (5) onto POST (3). See Fig. 4.
6a. Towel Bars (Single): Assemble TOWEL BAR (7) between END POSTS (6). Place END
POST (6) onto POST (3) and secure into place with SETSCREW (4). See Fig. 5.
6b.
Towel Ring:
Slide END POST (6) onto POST (3) and secure into place
with SETSCREW (4). See Fig. 6.
6c. Tissue Holder (2 & 3 Post): Place END POSTS (6) onto POSTS (3) and secure into
place with SETSCREW (4). Place HOLDER (7) between END POSTS (6). See Fig. 7.
Distance between
posts
Fig. 1
Fig. 2
1
5
3
Fig. 4
Fig. 5
Fig. 7
6
4
6
4
7
6
6
3
Distance
between
posts
Distance
between
posts
Fig. 6
3
3
3
2 5/16”
4
4
6
3
Fig. 3
2
3
7