Newport Brass 280N Ithaca User Manual
Page 2
We recommend Installation of this product by a Professional Plumbing
Contractor
Supply Elbow Installation:
Based on finished wall thickness, installer must use an appropriate length 1/2” NPT NIPPLE (1),
not included, for hand SHOWER (8) installation.
Apply thread sealant to both ends of the NIPPLE (1) and thread into FITTING (2) behind finished
wall.
Attach supply ELBOW (3) onto other end of NIPPLE (1).
Figure 1
2
3
1
9
10
Hand Spray Holder Installation:
Locate the desired position of Hand shower on finished wall.
Mark wall and drill 5/16” hole for wall ANCHORS (5).
Secure BASE (6) in place with SCREWS (7) by tightened into ANCHORS (5). Secure HOLDER (8)
onto BASE (6) with SET SCREW (9).
Figure 2
5
7
6
9
8
Base O-ring
NWP-280N
EN-1735
REV -
See also other documents in the category Newport Brass For Home:
- 212 (2 pages)
- 941 (3 pages)
- 277-02 (2 pages)
- 12-27 (2 pages)
- 22-51 & 52 (3 pages)
- 120 Brasstech (1 page)
- 9451-1 (3 pages)
- 2540A Metro (3 pages)
- 22-28 (2 pages)
- 29-28 (1 page)
- 3-424 Kiara (2 pages)
- 280H (1 page)
- 7008X (4 pages)
- 283 (2 pages)
- 283-4 (2 pages)
- 3-1767 Victoria (4 pages)
- 2546 Metro (2 pages)
- 1-564 (1 page)
- 31-12 Towel Ring_Garment Hook (2 pages)
- 130 Brasstech (1 page)
- 29-52 (4 pages)
- 9452-1 (3 pages)
- 30-27 (2 pages)
- 104B (2 pages)
- 30-28 (2 pages)
- 280J (2 pages)
- 3-906 Kayan (4 pages)
- 281A (2 pages)
- 26-28 (2 pages)
- 281B (2 pages)
- 15-12 Towel Ring_Garment Hook (2 pages)
- 12-02 (1 page)
- 281C (2 pages)
- 29-30 (2 pages)
- 19-27 (2 pages)
- 39-28 (2 pages)
- 9901 (3 pages)
- 9453-1 (3 pages)
- 280M (2 pages)
- 2500-5503 (2 pages)
- 280A (2 pages)
- 22-12 Towel Ring_Garment Hook (2 pages)
- 1660 Astaire (4 pages)
- 2566 Skylar (3 pages)
- 281 (2 pages)