beautypg.com

Newport Brass 1508 East Linear User Manual

Page 2

background image

NWP-1503 / 1508

Recommended Installation by a Professional Plumbing Contractor

Note: The use of petroleum base plumbers putty on our products will nullify the

warranty. We recommend the use of clear silicone sealing materials.

Recommended deck thru hole Ø 1.25”

1. Place the spout shank & hoses through mounting surface. Secure spout into

place with mounting nut. (Utilize stabilizer bracket in addition to mounting

nut when installing to a stainless steel sink. See Fig. 1

2. Attach hot/cold spout supply hoses to appropriate supply lines and valves in

the wall. Spout supply hose ends ½” NPT. See Fig. 2

3. Installing drain assembly - Remove top flange/stopper assembly from tail

piece. Insert tailpiece up through sink drain hole. See Fig. 3

4. Reattach top flange stopper assembly to tailpiece. Apply clear silicone

sealant to underside of flange. Press flange down flush to sink. See Fig. 4

5. Slide cone washer up tailpiece, (cone side up), against underside of sink.

Thread flange nut with steel washer between rubber washer & flange nut.

Firmly tighten. See Fig. 5

6. Attach tailpiece to p-trap drain (not included). See Fig. 5

7. Remove aerator from spout, turn on water supply, and flush system until

water is clear. Check for leaks and make any final adjustments required. Re-attach

aerator to the spout.