Newport Brass 1508 East Linear User Manual
Page 2

NWP-1503 / 1508
Recommended Installation by a Professional Plumbing Contractor
Note: The use of petroleum base plumbers putty on our products will nullify the
warranty. We recommend the use of clear silicone sealing materials.
Recommended deck thru hole Ø 1.25”
1. Place the spout shank & hoses through mounting surface. Secure spout into
place with mounting nut. (Utilize stabilizer bracket in addition to mounting
nut when installing to a stainless steel sink. See Fig. 1
2. Attach hot/cold spout supply hoses to appropriate supply lines and valves in
the wall. Spout supply hose ends ½” NPT. See Fig. 2
3. Installing drain assembly - Remove top flange/stopper assembly from tail
piece. Insert tailpiece up through sink drain hole. See Fig. 3
4. Reattach top flange stopper assembly to tailpiece. Apply clear silicone
sealant to underside of flange. Press flange down flush to sink. See Fig. 4
5. Slide cone washer up tailpiece, (cone side up), against underside of sink.
Thread flange nut with steel washer between rubber washer & flange nut.
Firmly tighten. See Fig. 5
6. Attach tailpiece to p-trap drain (not included). See Fig. 5
7. Remove aerator from spout, turn on water supply, and flush system until
water is clear. Check for leaks and make any final adjustments required. Re-attach
aerator to the spout.