beautypg.com

Figure 2 – Newport Brass 2470-5603 User Manual

Page 3

background image

3. TEST INSTALLED FAUCET
· Turn on water supply. Rotate the hot handle and hold until the tank fills up, (tank is full when water comes

out of the spout). Rotate hot handle to turn water off.

· Check all connections for leaks. Make any final adjustments as required by first turning off the water supply

to relieve the pressure.

· Plug in the water tank and wait between 10-15 minutes for water to reach its target temperature.

ATTACHING WATER CONNECTIONS TO SUPPLY AND TANK (See Fig 2)
· Connect blue tube to copper tubing of water supply, utilizing a compression nut or connec-

tor coupling (not included).

· Connect clear tube to heater tank outlet, utilizing brass coupling & insert.
· Connect red tube to heater tank inlet, utilizing connector coupling (not included).

Figure 2

Water supply &
optional connectors
(not included)

Blue tube

Red tube

Clear tube

Tank inlet

Brass coupling
w/ insert

Inlet coupling
(not included)

Tank outlet

Hot water Tank
#5-036

(949) 417-5207

NWP-106 Santa Ana, CA 92705 08/05/13

www.brasstech.com