Figure 2 – Newport Brass 2470-5603 User Manual
Page 3
3. TEST INSTALLED FAUCET
· Turn on water supply. Rotate the hot handle and hold until the tank fills up, (tank is full when water comes
out of the spout). Rotate hot handle to turn water off.
· Check all connections for leaks. Make any final adjustments as required by first turning off the water supply
to relieve the pressure.
· Plug in the water tank and wait between 10-15 minutes for water to reach its target temperature.
ATTACHING WATER CONNECTIONS TO SUPPLY AND TANK (See Fig 2)
· Connect blue tube to copper tubing of water supply, utilizing a compression nut or connec-
tor coupling (not included).
· Connect clear tube to heater tank outlet, utilizing brass coupling & insert.
· Connect red tube to heater tank inlet, utilizing connector coupling (not included).
Figure 2
Water supply &
optional connectors
(not included)
Blue tube
Red tube
Clear tube
Tank inlet
Brass coupling
w/ insert
Inlet coupling
(not included)
Tank outlet
Hot water Tank
#5-036
(949) 417-5207
NWP-106 Santa Ana, CA 92705 08/05/13
www.brasstech.com