beautypg.com

Newport Brass 30-10 Open Towel Ring User Manual

Open towel ring installation instructions

background image

Open Towel Ring

Installation Instructions

Model No. 13-10,16-10, 29-10, 30-10

Recommended Installation by a Professional Contractor

1. Drill hole in wall at desired location using the appropriate drill size:

· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill

2. Fasten FLANGE (1) to wall using either WOOD/TOGGLE SCREWS (2). (See Fig. 1)

3. Position SPLINE (4) into FLANGE (1), per the Table below, at the proper height from mounting surface. Secure into place by

tightening SETSCREW (5). (See Fig. 2)

4.Temporarily place ASSEMBLY (6) onto BASE (1) to check alignment. If necessary, loosen lower screw on BASE (1) and adjust.

Retighten screw.

5.When applicable to model, place the ESCUTCHEON (7) onto FLANGE (1). Place ASSEMBLY (6) over POST (4) and against the

ESCUTCHEON (7). Secure into place by tightening the SETSCREW (5). (See Fig. 3).

5a.When applicable to model, locate the ESCUTCHEON (7) with O-RING (8) over FLANGE (1). Place ASSEMBLY (6)

over POST (4) and against the ESCUTCHEON (7). Secure into place by tightening the SETSCREW (5). (See Fig. 3a)

5b.When applicable to model, locate the ESCUTCHEON (7) over FLANGE (1). Insert NUT (8) into BONNET (9) and attach to

POST (4). Place ASSEMBLY (6) over POST (4) and against the NUT (8). Secure into place by tightening the SETSCREW
(5). (See Fig. 3a)

Fig. 1

Fig. 3

7

6

2

1

5

4

MODEL

13-

16-

29-

30-

STEM HT.

2 3/16"

2 3/16"

2”

2 5/16”

Fig. 3a

Fig. 3b

Post Height

See Table

Fig. 2

5

4

1

7

6

1

5

4

7

6

1

5

4

1

8

8

9