Newport Brass 949 User Manual
Page 2
Recommended Installation by a Professional Plumbing Contractor
Note: The use of petroleum base plumbers putty on our products will nullify the warranty.
We recommend the use of clear silicone sealing materials.
1. Shut off water supply. Tap into existing cold water supply and run to desired location on the
wall for 1/2-14 NPT connection.
2. Remove telescoping SPOUT (1) from BODY (2). See Figure 1.
3. Attach BODY (2) to water supply (3). See Figure 2.
4. Reattach telescoping SPOUT (1) to BODY (2).
5. Turn on water supply, and flush valve until water is clear. Check for leaks and make any final
adjustments required.
NWP-948
See also other documents in the category Newport Brass For Home:
- 212 (2 pages)
- 941 (3 pages)
- 277-02 (2 pages)
- 12-27 (2 pages)
- 22-51 & 52 (3 pages)
- 120 Brasstech (1 page)
- 9451-1 (3 pages)
- 2540A Metro (3 pages)
- 22-28 (2 pages)
- 29-28 (1 page)
- 3-424 Kiara (2 pages)
- 280H (1 page)
- 7008X (4 pages)
- 283 (2 pages)
- 283-4 (2 pages)
- 3-1767 Victoria (4 pages)
- 2546 Metro (2 pages)
- 1-564 (1 page)
- 31-12 Towel Ring_Garment Hook (2 pages)
- 130 Brasstech (1 page)
- 29-52 (4 pages)
- 9452-1 (3 pages)
- 30-27 (2 pages)
- 104B (2 pages)
- 30-28 (2 pages)
- 280J (2 pages)
- 3-906 Kayan (4 pages)
- 281A (2 pages)
- 26-28 (2 pages)
- 281B (2 pages)
- 15-12 Towel Ring_Garment Hook (2 pages)
- 12-02 (1 page)
- 281C (2 pages)
- 29-30 (2 pages)
- 19-27 (2 pages)
- 39-28 (2 pages)
- 9901 (3 pages)
- 9453-1 (3 pages)
- 280M (2 pages)
- 2500-5503 (2 pages)
- 280A (2 pages)
- 22-12 Towel Ring_Garment Hook (2 pages)
- 1660 Astaire (4 pages)
- 2566 Skylar (3 pages)
- 281 (2 pages)