beautypg.com

Newport Brass 808 User Manual

Page 2

background image

Recommended Installation by a Professional Plumbing Contractor

Note: The use of petroleum base plumbers putty on our products will nullify the warranty.

We recommend the use of clear silicone sealing materials. Recommended deck thru hole Ø
1.25".

1. Place the spout assembly SHANK (1) through holes of mounting surface. Secure into place

with flange NUT (2). See Figure 1.

2.Connect hot/cold water supply to appropriate spout SHANK (1), utilizing one of the three

following types of risers. Supply risers not included. See Figure 2.
a. 1/2” IPS flexible riser: discard rubber nosecone WASHER (3), friction WASHER (4) and cou-
pling NUT (5).
b. 3/8” or 1/2” OD bullnose riser: utilize friction WASHER (4) and coupling NUT (5).
c. 1/2” copper riser: utilize rubber nosecone WASHER (3), friction WASHER (4) and coupling
NUT (5). Attach hot/cold water supply hoses (not included) to appropriate faucet nipple, uti-
lizing washer, nosecone washer, and slip joint nut (included).

3. Attach other end of supply tube/hose to existing wall valves.

4. Remove AERATOR (6) from spout, turn on water supply, and flush both valves until water

is clear. Check for leaks and make any final adjustments required. Re-attach AERATOR (6)
to the spout.

NWP-808

10/10/2011