Newport Brass 29-52 User Manual
Page 2
SHADE UP INSTALLATION
1
Preparing Wall Outlet (for shade up installation)
A. Check fit the light fixture base over outlet box to ensure cutout in wall will be covered
completely after installation.
B. Pull live, neutral and ground wire(s) out of electrical outlet box and through the center of
mount plate.
C. Thread mounting screws through mount plate and attach to outlet box.
D. Be sure mount plate is straight with notch located at the top, tab at the bottom and flush
with wall surface.
CAUTION:
DISCONNECT POWER
Always shut off power when installing or repairing this, or any other
electric appliance.
FAILURE TO DO SO MAY RESULT IN SEVERE INJURY OR DEATH
Installation by a licensed electrical contractor recommended.
AMS-10-51
EN-2641
REV B
11/07/2013
See also other documents in the category Newport Brass For Home:
- 212 (2 pages)
- 941 (3 pages)
- 277-02 (2 pages)
- 12-27 (2 pages)
- 22-51 & 52 (3 pages)
- 120 Brasstech (1 page)
- 9451-1 (3 pages)
- 2540A Metro (3 pages)
- 22-28 (2 pages)
- 29-28 (1 page)
- 3-424 Kiara (2 pages)
- 280H (1 page)
- 7008X (4 pages)
- 283 (2 pages)
- 283-4 (2 pages)
- 3-1767 Victoria (4 pages)
- 2546 Metro (2 pages)
- 1-564 (1 page)
- 31-12 Towel Ring_Garment Hook (2 pages)
- 130 Brasstech (1 page)
- 9452-1 (3 pages)
- 30-27 (2 pages)
- 104B (2 pages)
- 30-28 (2 pages)
- 280J (2 pages)
- 3-906 Kayan (4 pages)
- 281A (2 pages)
- 26-28 (2 pages)
- 281B (2 pages)
- 15-12 Towel Ring_Garment Hook (2 pages)
- 12-02 (1 page)
- 281C (2 pages)
- 29-30 (2 pages)
- 19-27 (2 pages)
- 39-28 (2 pages)
- 9901 (3 pages)
- 9453-1 (3 pages)
- 280M (2 pages)
- 2500-5503 (2 pages)
- 280A (2 pages)
- 22-12 Towel Ring_Garment Hook (2 pages)
- 1660 Astaire (4 pages)
- 2566 Skylar (3 pages)
- 281 (2 pages)