beautypg.com

Illustration b illustration c, Detail 3 – Peerless-AV PLB-1 - Installation User Manual

Page 5

background image

5

5

5

5

5 of 55555

ISSUED: 04-22-03 SHEET #: 201-9046-5 04-20-10

Visit the Peerless Web Site at www.peerlessindustries.com

For customer service call 1-800-729-0307 or 708-865-8870.

Hang each plasma screen on interface bracket (A) as shown in Illustration B. Adjust tilt as desired for each
screen and tighten eight M10 x 15 mm penta-pin screws (C) on interface bracket (A) using M10 x 2" penta-pin
tool (F).

E

After both screens are installed, lock interface bracket (A) into
place using one #8 x 3/8" truss head sheet metal screw (E) as
shown in Illustration C and detail 3.

Note: Make sure both screens are installed properly before
locking interface bracket (A) into place.

Illustration B

Illustration C

A

Detail 3

C

© 2007, Peerless Industries, Inc. All rights reserved.

All other brand and product names are trademarks or registered trademarks of their respective owners.