Warning, Installation to triple wood stud wall – Peerless-AV PANA-85WM - Installation User Manual
Page 4
4 of 8
ISSUED: 12-18-09 SHEET #: 125-9090-4 03-24-11
Installation to Triple Wood Stud Wall
Use a stud finder to locate the edges of the studs. Use of an edge-to-edge stud finder is highly recommended.
Based on their edges, draw a vertical line down each stud’s center. Place wall plate (
A) on wall as a template.
Level plate, and mark the center of the nine mounting holes. Make sure that the mounting holes are on the stud
centerlines. Drill nine 5/32" (4 mm) dia. holes 2.5" (64 mm) deep. Make sure that the wall plate is level, secure it
using nine #14 x 2.5" wood screws (
I) as shown.
Skip to step 2.
• Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
• Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder
is highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Install-
ers are responsible to provide hardware for other types of mounting situations.
WARNING
1
A
I