beautypg.com

Ld g c, Ia j a g – Peerless-AV SC590 - Installation User Manual

Page 6

background image

6 of 12

ISSUED: 08-08-12 SHEET #: 009-9074-1

L

D

G

C

Attach uprights (G) to base (D), as shown below using six 3/8-16 x 2.5" socket screws (L) and M10 x .402ID lock
washers (C). Tighten all screws.

3

L

oosely attach six 1/4-20 x 12 mm screws (I) and

1/4-20 nuts (J) to mount bracket (A)

.

Repeat with second

mount bracket (A)

4

S

lid

e mount bracket (A) onto upright (G) so that 1/4-

20 nuts (J) slide into slots of upright (G) as shown in
fi gure 5.1 and detail 1. Slide display mount bracket
to desired position, level, then tighten
1/4-20 x 12 mm screws (I) using 4 mm allen wrench
(Q).

Repeat with second

mount bracket (A).

NOTE: Make sure that two mount brackets (A)
are level.

5

I

A

J

A

G

SLOT

fi g. 5.1

I

DETAIL 1

J

G

fi g. 3.1