beautypg.com

Electrical characteristics (continued) – Rainbow Electronics MAX1427 User Manual

Page 3

background image

MAX1427

15-Bit, 80Msps ADC with -79.3dBFS

Noise Floor for Baseband Applications

_______________________________________________________________________________________

3

ELECTRICAL CHARACTERISTICS (continued)

(AV

CC

= 5V, DV

CC

= DRV

CC

= 2.5V, GND = 0, INP and INN driven differentially with -1dBFS, CLKP and CLKN driven differentially

with a 2V

P-P

sinusoidal input signal, C

L

= 5pF at digital outputs, f

CLK

= 80MHz, T

A

= T

MIN

to T

MAX

, unless otherwise noted. Typical

values are at T

A

= +25°C, unless otherwise noted. ≥+25°C guaranteed by production test, <+25°C guaranteed by design and char-

acterization.)

PARAMETER

SYMBOL

CONDITIONS

MIN

TYP

MAX

UNITS

f

IN

= 5MHz at -1dBFS

76.3

f

IN

= 15MHz at -1dBFS

73

75.9

Signal-to-Noise and Distortion
(Note 1)

f

IN

= 35MHz at -1dBFS

75.3

dB

f

IN

= 5MHz at -1dBFS

96.5

f

IN

= 15MHz at -1dBFS

84

93.5

Spurious-Free Dynamic Range
(HD2 and HD3)
(Note 1)

SFDR1

f

IN

= 35MHz at -1dBFS

85

dBc

f

IN

= 5MHz at -1dBFS

94.5

f

IN

= 15MHz at -1dBFS

85.5

94.5

Spurious-Free Dynamic Range
(HD4 and Higher)
(Note 1)

SFDR2

f

IN

= 35MHz at -1dBFS

91

dBc

Two-Tone Intermodulation
Distortion

TTIMD

f

IN1

= 10MHz at -7dBFS;

f

IN2

= 15MHz at -7dBFS

-91

dBc

Two-Tone Spurious-Free
Dynamic Range

SFDR

TT

f

IN1

= 10MHz at -10dBFS < f

IN1

< -100dBFS;

f

IN2

= 15MHz at -10dBFS < f

IN2

< -100dBFS

-105

dBFS

DIGITAL OUTPUTS (D0–D14, DAV, DOR)

Digital Output Voltage Low

V

OL

0.5

V

Digital Output Voltage High

V

OH

DV

CC

-

0.5

V

TIMING CHARACTERISTICS (DV

CC

= DRV

CC

= 2.5V)

Figure 4

CLKP/CLKN Duty Cycle

Duty cycle

50

±5

%

Effective Aperture Delay

t

AD

230

ps

Output Data Delay

t

DAT

(Note 3)

3

4.5

7.5

ns

Data Valid Delay

t

DAV

(Note 3)

5.3

6.5

8.7

ns

Pipeline Latency

t

LATENCY

3

Clock

cycles

CLKP Rising Edge to DATA
Not Valid

t

DNV

(Note 3)

2.6

3.8

5.7

ns

CLKP Rising Edge to DATA
Valid (Guaranteed)

t

DGV

(Note 3)

3.4

5.2

8.6

ns

DATA Setup Time
(Before DAV Rising Edge)

t

SETUP

(Note 3)

t

CLKP

-

0.5

t

CLKP

+ 1.3

t

CLKP

+ 2.4

ns

DATA Hold Time
(After DAV Rising Edge)

t

HOLD

(Note 3)

t

CLKN

-

3.6

t

CLKN

-

2.8

t

CLKN

-

2.0

ns