12. With all the body mount spacers installed remove the floor jack. use a 16mm
socket and tighten all the 2 nuts per mount down to 40 ft lbs. Using a 18mm
socket tighten down the 1 bolt per mount down to 80ft lbs.
13.
Connect the electrical connectors(4) and position the grill(2) onto the front
end of the grille support and seat the clips(3) fully. Install the push pin fas-
teners(1).
14. Close the hood down.
15. Check that all the bolts and nuts are tighten down to spec.
16. If a manuel trans you may have to trim the inner boot to clear when shifting.
17. If a 2 door Jeep, there will be lift over body mounts and stud extenders.
18. Check all bolt and nuts after 500 miles.
Installation steps
1. The tools needed for installation are on the back cover. A list of parts in the
kit are under the tool listing. Make sure you have all of the proper tools and
understand these directions before proceeding. Torque specs are on back
cover.
2. If working on a 2dr module jeep, you will have 2 extra mounts and 4 extra
stud extenders.
3. Place Jeep on a level ground. Open the hood and use a Phillips screw driver
to twist the center of the push pin insert to release and remove the six push
pin fasteners(1), release the lower clips( 3 ) and separate the grille from the
Jeep and disconnect the electrical connectors ( 4).