6. Installation

PNEG-1094 Farm Grain Bin - 4" Corrugation

45

Vertical Supports

After all three (3) hoop assemblies are in place, attach the 48" vertical supports from hoop assembly to hoop
assembly as shown. This will require ten (10) supports, five (5) between each set of hoops. The 2

nd

set of

vertical supports will need to be bent at the flat area to allow for the tapering of the bottom hoop assembly.
Use 5/16" x 3/4" bolts (unless otherwise noted) with the head of the bolt to the inside of the safety cage.

Figure 6R Vertical Supports

Safety Cage

Attach the vertical support pieces to the existing hoop halves above using the 5/16" x 3/4" bolts and nuts
(with the heads on the inside of the cage). Fasten two (2) hoop halves together and bolt to other end of
vertical supports. Attach cage hoop brackets to ladder as shown in

Figure 6S

. Once cage hoop brackets

have been installed, attach cage hoop halves and tighten bolts. Repeat installation for each safety
cage required.

Figure 6S