6. Installation

28

PNEG-1094 Farm Grain Bin - 4" Corrugation

Door Placement

Consider the location of the door and other accessories before starting the bin. Proper placement of lifting
jacks in relationship to the anchor bolts could make a difference on odd or even ring bins.

(See Figure 6B

and

Figure 6C.)

NOTE: The walk-through diameter door must be centered between two (2) anchor bolts. The sidewall

sheets are staggered 1/3 from end to end.

Figure 6B Odd Number of Rings

Figure 6C Even Number of Rings