beautypg.com

Head to, Step 5, Assembly & installation – Grain Systems Custom, Utility and Bulk Tank Augers PNEG-1435 User Manual

Page 18

background image

18

PNEG-1435 6", 8" & 10" Utility & Bulk Augers

4. ASSEMBLY & INSTALLATION

5. Insert the intake shaft into the flight and connect with proper grade 8 bolt and stover nut

(See Chart)

and

(Figure 4E)

.

Figure 4E

6. The galvanized tube may need to be cut to expose enough auger flighting, depending on

the application.

6" Units require 20". It is necessary to field cut auger tube lengths to accommodate required
exposure. Butt the auger tube to the unloader tube and attach using a connecting band.

IMPORTANT: Auger stub shaft supplied is designed to fit GSI 6" bulk tank augers. If using

a different auger supplier it may be necessary to modify or fabricate a stub
shaft for the unloader bearing.

Flight Hardware

6"

3/8" x 2" - 16 Grade 8 Hex Bolts

8"

7/16" x 3" - 14 Grade 8 Hex Bolts

10"

1/2" x 3-1/2" - 13 Grade 8 Hex Bolts

Hex Bolt

(See Chart)

Flight

Nut

Intake Shaft