Chapter 7: roof assembly – Grain Systems Tanks PNEG-4054A User Manual
Page 86
Table 7-1 A-frame installation sequence and temperature cable locations for 54 ft diameter bin
A-frame number
Rafter Number
Temp Cable Number
Radius Location
A1
R1
—
—
R2
T3
15.5 ft
A2
R9
—
—
R10
—
—
A3
R13
—
—
R14
T7
15.5 ft
A4
R5
T4
15.5 ft
R6
—
—
A5
R3
—
—
R4
—
—
A6
R11
T6
15.5 ft
R12
—
—
A7
R15
—
—
R16
—
—
A8
R7
—
—
R8
T5
15.5 ft
A9
R17
T2
15.5 ft
R18
—
—
NA
Attach to center collar
T1
3 ft
NOTE: A-frames labeled “A1” through “A4” have X-bracing and are installed first. A-frames labeled “A5”
through “A9” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.
Table 7-2 Starting lengths for temperature cables for 54 ft diameter bins
Length from the center collar
223.7 in. (568.20 cm)
Length from 15.5 ft diameter location
130.8 in. (332.23 cm)
The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.
86
Pneg-4054A 54 Ft Diameter 40-Series Bin