Chapter 7: Roof Assembly

Table 7-1 A-frame installation sequence and temperature cable locations for 54 ft diameter bin

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A1

R1

R2

T3

15.5 ft

A2

R9

R10

A3

R13

R14

T7

15.5 ft

A4

R5

T4

15.5 ft

R6

A5

R3

R4

A6

R11

T6

15.5 ft

R12

A7

R15

R16

A8

R7

R8

T5

15.5 ft

A9

R17

T2

15.5 ft

R18

NA

Attach to center collar

T1

3 ft

NOTE: A-frames labeled “A1” through “A4” have X-bracing and are installed first. A-frames labeled “A5”

through “A9” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.

Table 7-2 Starting lengths for temperature cables for 54 ft diameter bins

Length from the center collar

223.7 in. (568.20 cm)

Length from 15.5 ft diameter location

130.8 in. (332.23 cm)

The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.