Chapter 7: Roof Assembly

Figure 7-32 Assembling the long center collar channels

F

Short center collar channel (CTR-0154)

H

7/16 in. flange nut (S-10251)

G

7/16 x 1-1/4 in. flange bolt (S-10250)

I

Long center collar channel (CTR-0153)

12.Place the center cap plate (Q) onto the center collar channel assembly, ensuring the center cap

plate is parallel to the long center collar channel (I).

13.Apply a strip of tube caulk (K) along the inside edge row of holes as shown.

14.Install a splice plate (J) over the fresh strip of caulk (K).

15.Align the holes in the splice plate (J) and center cap plate (Q) with the holes in the long center collar

channel (I), and loosely install five bolts (M) and nuts (P) into the inner row of holes, working outward
from the center of the splice plate.

NOTE: Splice plate must remain loose, allowing for side cap plate to be tucked into place.

16.Locate the side cap plate (L), and apply a strip of tube caulk (K) along the row of holes as shown.

Pneg-4054A 54 Ft Diameter 40-Series Bin