Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1391 User Manual

Page 22

background image

22

Assembly

PNEG-1391 8",10", & 12" BE-SAW Augers

A. Attach Transition* to B.E. Boot using 3/8"-16 x 1"

HHCS bolts, 3/8" lock washers, & 3/8"-16 Hex nuts.

B. Use a sling to lift the downspout end of the incline

tube assembly and position it directly over the tran-
sition opening.

C. Completely lower the tube until the spout flange

sits flat on top of the transition.

D. Install the spout flange to the top of the main inlet

hopper using four (4) 2" O.D. flat washers and 3/
8" nylon locknuts. The incline tube spout should
rotate on the top of the main inlet hopper.

*See next page for transition information.

5. ASSEMBLE 8", 10", OR 12" INCLINE TUBE TO BUCKET ELEVATOR BOOT (See Figure 5)

Swivel Spout

Weldment

Tube

Weldment

3/8" Nylock
Nut

3/8"
Washer

Transition

3/8"-16 x 1 HHCS

3/8" Lock Washer

3/8" Hex Nut

Bucket Elevator Boot