beautypg.com

12" standard profile hopper assembly – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1391 User Manual

Page 18

background image

18

Assembly

PNEG-1391 8",10", & 12" BE-SAW Augers

L. Slide head end of the incline flight onto the spout studs. Secure the incline flight in place by using a

5/8" x 3-1/2" long (grade 5) hex head capscrew with a locknut. (See Fig. 2-C on page 17.)

2. ASSEMBLE 12" HOPPER AND IN-LINE TUBE ASSEMBLY (CONT.)

Be sure to install the spacer bushings between the back of the spout and
the ring. After the 3/8" nylon locknuts are tightened, the spout MUST BE
ABLE TO SWIVEL on the incline tube.

FIG. 2-D

3/8" X 1 3/4"
LONG HEX
HEAD
CAPSCREW
WELDED TO
SPOUT

STOP RING
WELDED TO
INCLINE
TUBE

M. Slide incline tube onto the back of the downspout, lining up the holes on the incline ring with the bolts

welded onto the down spout. Fasten using eight (8) 19/32" long spacer bushings, eight (8)
3/8" x 1-3/4" long hexhead capscrews, eight (8) flat washers, and eight (8) 3/8" nylon locknuts.

12" Standard Profile Hopper Assembly