Chapter 7: Roof Assembly

NOTE: Eyebolt will pass through three layers of steel: the splice plate (V), the center cap plates (L

and M), and the long center collar channels (I).

32.Tighten all hardware to the recommended torque specifications. See

Bolt Torque Specifications,

page 26

.

Figure 7-29 Installing the cap plates

A

3/8 in. nut (S-456)

Q

Side cap plate (CTR-0360)

L

Center cap plate (CTR-0281)

R

Side cap plate (CTR-0323)

M

Center cap plate (CTR-0325)

S

Side cap plate (CTR-0324)

N

Tube caulk

V

Splice plate (CTR-0326)

P

3/8 x 1 in. bolt with sealing washer (S-7487)

W

Vendor lifting eyebolt

Assembling the Center Collar

The center collar assembles each A-frame roof rafter section together at the top. The center collar assem-
bly is a three piece design and will need to be spliced together with splice plates.

Before You Begin

Pneg-4135 135 Ft Diameter 40-Series Bin

115