Installing the housing assembly, Installation – Grain Systems PNEG-1894 User Manual
Page 14

4. Installation
14
PNEG-1894 Top Dry Chute Controller
Installing the Housing Assembly
1. Lift the housing assembly onto the lower mounting gussets (A), aligning holes in the bottom
of the chute position controller enclosure with the holes in the lower mounting gussets.
2. Remove cover to attach chute position controller enclosure to gussets with six (6) flange bolts (B)
and flange nuts (C).
3. Field drill all four (4) holes in the bin sidewalls through the four (4) holes in the sidewall mounting
brackets (D), making sure that the holes are drilled on the peaks of the corrugation ridges. Use bolts
to attach housing to bin.
Figure 4G
Ref #
Part #
Description
A
TD-101326
Lower Mounting Gussets
B
S-6606
Flange Bolt 5/16"-18 x 3/4" ZN Grade 5
C
S-3611
Flange Nut 5/16"-18 YDP Grade 2
D
Sidewall Mounting Bracket
Chute position controller enclosure weighs approximately 275 lbs. pounds. Failure
to use proper equipment and personnel when lifting could cause bodily injury or
damage to equipment.
WARNING