beautypg.com

Ladder section assembly – Grain Systems Tanks PNEG-1912 User Manual

Page 39

background image

8. Optional BFT Ladder Assembly

PNEG-1912 6', 7' and 9' Tall BFT Series and GHT Series

39

Ladder Section Assembly

Two (2) splice plates are required to attach each additional ladder section. The head of the bolt should be
to the inside of the ladder with the splice plate on the outside as shown in

Figure 8L

. Use 5/16" x 3/4" bolts

for all connections.

NOTE: With most installations, the last ladder section to reach the concrete will need to be cut to fit.

Figure 8L