Straight-through tandem installation – Grain Systems Bin Accessories PNEG-914 User Manual
Page 19
5. Installation
PNEG-914 Flex-Flo
19
Straight-Through Tandem Installation
The straight-through tandem system should be installed the same as a single tank system with the
following exceptions:
1. Mount the boots on both tanks and the single or twin-out unloader as instructed.
2. Install baffle plate (FLX-4310) in the single-through unloader as shown in
. The twin
unloader baffle is factory installed as shown in
.
Figure 5H
3. Slide the belled end of a straight tube onto the unloader outlet on the first tank. Hold the straight
tubing in the desired mounting position. Mark and cut the straight tube at the point where the tube
and the inlet of the straight-through unloader inlet intersect.
4. Slip the appropriate tube coupler over the cut end of the straight tube. Position the straight tube in its
operating location. Slide and clamp the tube coupler over the straight-through unloader inlet.
NOTE: The coupler should be equally distributed between the tubing and the unloader inlet.
Figure 5I Tandem System Installation
5. Feed the auger through the single/twin-out unloader to the rest of the system and anchor as instructed.