beautypg.com

Inspection/clean-out plate installation – Grain Systems Bin Accessories PNEG-914 User Manual

Page 17

background image

5. Installation

PNEG-914 Flex-Flo

17

Inspection/Clean-Out Plate Installation

Once the installation of the auger tubes and auger is complete, insert the inspection/clean-out plate or the
optional unloader switch.

The inspection/clean-out plate is to be installed per the following instructions:

(See Figure 5F.)

1. Back off both wing nuts to the stud ends.

2. Slide the plate onto the lower side of the unloader opening.

3. Move the plate first against the side of the unloader then upward toward the top of the unloader.

4. Tighten the wing nuts while holding the plate steady.

Figure 5F Clean-Out Plate Installation