Assemble top spout to support frame – Grain Systems PNEG-1890 User Manual
Page 10
Chapter 1 Top Dry Air Box Assembly
Assemble Top Spout to Support Frame
The top spout is fastened to the top of the air box using three bolts through threaded plates located on the
inside of the box.
1. Align holes in bottom of top spout (A) with holes in rubber gasket (C) and support frame top (D).
2. Fasten together using only three bolts (B). Do not install the bolt located on the door side.
Callout
Part Number
Description
A
TD-101313
Air Box Top Spout Weldment
B
S-277
5/16”-18 X 1–1/4” Grade 5 Bin Bolt
C
TD-101325
Rubber Gasket Seal
D
TD-101155
Air Box Support Frame
10
Pneg-1890 Top Dry Air Box
See also other documents in the category Grain Systems Conditioners:
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)