1.

For 2002-03 models only, it is

necessary to relocate the factory-

installed frame-mounted hanger pin

that is located behind the transmission

crossmember.
A. Remove the two (2) nuts that hold

the frame-mounted hanger pin to the

frame rail, save for reinstallation later.

Remove the frame-mounted hanger

pin from vehicle.

B. Remove the two (2) 8mm studs from

the frame-mount hanger pin.
NOTE: Studs are pressed into hanger

pin and will require the use of a

hammer or small press to remove.

C. Reinstall the frame-mounted hanger

pin using the two (2)

5

8

” long steel

spacers, two (2) 8mm x 1.25 x

45mm bolts and the two (2) 8mm

nuts (removed in Step A above).

See Figure 3 for proper assembly

sequence. Torque fasteners to 18 ft-lb.

2.

Reusing the saved V-band clamp

previously put aside, loosely clamp

the upper portion of the turbine outlet

pipe to the warm-up valve or the Banks

Brake on the turbocharger. Do not

tighten at this time.
NOTE: On some Power Strokes a ground

strap is bolted on back of the cylinder

head. This bolt may interfere with the

Banks turbine outlet pipe. If so, remove

the bolt and relocate it in the cylinder

head.

3.

Place a 4” exhaust clamp on the

turbine outlet pipe. Install the front

intermediate pipe onto the turbine

outlet pipe. Place a 4” exhaust clamp on

the front intermediate pipe (see Figure

5).
For vehicles with a catalytic

converter: Place a 4” exhaust clamp on

the turbine outlet pipe. Install the front

intermediate pipe onto the T.O.P., aligning

the hanger pin in the rubber hanger.

Put a 3

1

2

” clamp on the end of the

front intermediate pipe and reinstall the

catalytic converter (where you have cut

per step 3-4). Put another 3

1

2

” clamp on

the outlet of the catalytic converter (see

Figure 5).

4.

For Standard Cab long-bed

vehicles: It will be necessary to cut

4

3

4

” off the rear intermediate pipe

supplied in the kit. The hanger will be

removed with the unused portion of

the pipe (see Figure 4). Install the rear

intermediate pipe.
For Excursions and Super-cab short-

bed: Install the rear intermediate pipe

as supplied (no cut required).
For Crew-cab short-bed: Install the

rear intermediate pipe. Place a 4” clamp

on the end of the rear intermediate

pipe and install the extension pipe (P/N

53513).
For Super-cab long-bed: Remove the

rear frame mounted hanger and install

the supplied frame mounted hanger in

its place, using the two 8mm x 30mm

hex bolts supplied and re-using the

two 8mm nuts previously removed (see

Figure 6). Install the rear intermediate

pipe. Place a 4” clamp on the end of the

rear intermediate pipe and install the

extension pipe (P/N 53514).
For Crew-cab long-bed: Install the rear

intermediate pipe. Place a 4” clamp on

the end of the ear intermediate pipe and

install the extension pipe (P/N 53515).

5.

Place the front hanger clamp on the

inlet end of the Banks Monster muffler

and install it onto the intermediate

pipe or extension pipe. Note the inlet

labeling on the Monster muffler. Be sure

the Banks Monster embossing on the

muffler is level with the frame.
Insert the front hanger pin into the

rubber hanger at the front of the

muffler.

6.

For trucks, slide the rear hanger

clamp over the outlet of the muffler with

the hanger pins facing forward. Insert

the hanger pin(s) into the corresponding

rubber hanger(s).

Section 6

MoNSTER

®

EXHAuST INSTALLATIoN (PART 2 oF 2)

Figure 3- Proper Frame Mounted Hanger Assembly Sequence