Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Power Systems- PowerPack & Stinger Systems w EconoMind (LLY & LBZ) '06-07 (iQ) Compatible with Optional Banks iQ User Manual
Page 27

96816 v.3.0
27
INSTaLLaTION OF WIRING
HaRNESS, CONNECTIONS aND
EconoMind DIESEL TuNER
1.
From the engine compartment,
locate the rubber grommet high
on the driver’s side of the vehicle
firewall. The grommet is about 3”
in diameter. Make a 1” x 1” cross-
shaped incision in the grommet (see
Figure 5.1).
2.
From the engine compartment,
feed the grey three-connector cable
through the incision made in the
firewall grommet and into the cab.
From inside the cab, remove the
lower dash panel under the steering
column to allow access to these
three connectors.
3.
Locate the two black wire harness
locking connectors between the
brake fluid reservoir and the air
conditioning compressor. Lift the gray
connector locks and disconnect the
38-pin connector pair and the 24-pin
connector pair (see Figure 5.2).
4.
Insert the male 38-pin connector
on the EconoMind harness into the
female 38- pin connector on the
factory harness. Insert the female
38-pin connector on the EconoMind
harness onto the male 38-pin
connector of the factory harness.
Repeat this process with the 24-pin
connectors (see Figure 5.2).
5.
Go to the air box and remove the
stock Mass Air Flow (MAF) connector
located on the Banks Intake tube
6.
Locate the MAF connector from
the EconoMind harness and route
as shown in Figure 5.3. Follow the
factory harness located on top of the
engine that runs in front of the intake
manifold and behind the alternator.
Feed the connector under the
compressor outlet and under where
the air intake hose normally rest.
7.
Connect the EconoMind (female)
MAF connector to the factory (male)
MAF sensor and connect the factory
(female) MAF connector to the
EconoMind (male) MAF connector.
8.
Connect the thermocouple
leadwire to the EconoMind harness
with the supplied nuts and bolts.
Cover this joint with the supplied
heat shrink tubing and heat until the
tubing conforms to the joint. Make
sure the entire joint is insulated.
Section 5
BaNkS ECONOMIND DIESEL TuNER INSTaLLaTION
Figure 5.0
General Assembly
Banks EconoMind Diesel Tuner
Figure 5.1