beautypg.com

9 switch-on phase, Internal check of the electronics, 5 connecting to power supply – VEGA VEGAFLEX 83 Profibus PA PFA insulated User Manual

Page 28

background image

28

5 Connecting to power supply

VEGAFLEX 83 • Profibus PA

44226-EN-130910

5

0

0

5

1

6

2

7

3

8

4

9

0

5

1

6

2

7

3

8

4

9

1

0

1

6 7 8

Bus

2

1

3

1 2

+

( )

(-)

Fig. 24: Address selection switch
1 Addresses <100 (selection 0), addresses >100 (selection 1)

2 Decade of the address (selection 0 to 9)

3 Unit position of the address (selection 0 to 9)

The software addressing is only effective if address 126 or higher is

adjusted on the instrument with the address selection switches.
The addressing procedure is described in the operating instructions

manual "Display and adjustment module.

5.9 Switch-on phase

After VEGAFLEX 83 is connected to the bus system, the instrument

carries out a self-test for approx. 30 seconds. The following steps are

carried out:

Internal check of the electronics

Indication of the instrument type, hardware and software version,

measurement loop name on the display or PC

Indication of the status message "F 105 Determine measured

value" on the display or PC

Status byte goes briefly to fault value

As soon as a plausible measured value is found, it is outputted to the

signal cable. The value corresponds to the actual level as well as the

settings already carried out, e.g. factory settings.

Software addressing