Focus Foodservice HDS-Plus High Density Storage System - Assembly Instructions User Manual
Page 3
SHELVING
Step 1
Connect track tube lengths using track joiners. To connect tubes with track joiners,
insert cap end of track joiner into tube section until it stops. Use wrench to tighten nut
on exposed end of track joiner until track joiner is snug in tubing. Take another section
of tube and twist onto exposed section of track joiner until two sections of tube meet.
Repeat process until both sections of track are assembled.
Step 2
Place locking collar on one end of fully assembled track length and tighten with Allen
wrench. Slide on ½ of the guide blocks, if your system requires a stationary
middle unit, place 1 locking collar on the track, then slide on 2 guide blocks then slide
on another locking collar. Do not tighten inner locking collars at this point. Then place
another locking collar on open end of tube and tighten with Allen wrench. Repeat
process with second section of track.
PART 4: OVERHEAD TRACK ASSEMBLY
Step 1
Line up Shelving Units in a straight line in the area where the unit will be installed. Allow a minimum of 30" of open aisle
space for each system. Bumpers add a minimum of 3" to the width of the mobile units. Place stationary units on the outside
and middle (as needed**) and mobile units on the inside. To ensure smooth movement of mobile sections take great care
that all shelving units are aligned in a straight line.
Note:
Track lengths over 20 ft in length require a stationary unit in the middle of the system.
PART 5: INSTALL TRACK ASSEMBLY ONTO SHELVING UNITS
Step 2
Using two or more people, raise one section of track assembly over tops of posts and starting on one end of shelving
run. Insert guide blocks into tops of posts. Continue to opposite end. Repeat process with second section of track. Recheck
shelving sections to ensure they are in straight alignment. To adjust for uneven floor surfaces, turn triangle security feet on
stationary posts (clockwise or counter-clockwise). For systems with stationary units in the middle of the track, tighten down
the locking collars surrounding these units..
Step 1
Lay completed shelving unit(s) with 74" posts on their side.
Step 2
With the opening of the bumper facing towards the bottom, slide bumper
over bottom of posts.
Step 3
Install 6" Casters (FTSC6 - CASTER MUST POINT INWARD AS SHOWN) through
openings in caster channels (FTSU18, FTSU21 or FTSU24).
Step 4
Install caster/caster channel assembly into 74" posts (FGN074C or FGN074G) until
caster fit is tight. If needed, use a rubber mallet and tap bottom of caster to drive
casters into posts. Repeat process for all mobile shelving units.
PART 3: CASTER ASSEMBLY OR MOBILE POST ASSEMBLY.
Use 74" mobile posts.