beautypg.com

Obtain vent system components, Gold cgs gas-f, Continued) – Weil-McLain GOLD CGs User Manual

Page 8

background image

GOLD CGs Gas-F

GOLD CGs Gas-F

GOLD CGs Gas-F

GOLD CGs Gas-F

GOLD CGs Gas-Fired W

ired W

ired W

ired W

ired Water Boiler

ater Boiler

ater Boiler

ater Boiler

ater Boiler

Part Number 550-141-873/0502

8

Termination coupling

Elastomer
flashing*

5” Type “B”
storm ring

5” Type “B”
adjustable
flashing

5” Type “B” rain cap with
hole in top for vent pipe

For minimum height
follow Type “B” gas
vent manufacturer’s
instruction

Fire stop

5” Type “B” stack

Vent pipe

5” type “B” support

5” type “B” draft hood connector

Single wall stack
reducer tee*

Cap with hole
for vent pipe

Elastomer
flashing*

Air intake pipe – 3” pvc,
standard 3” galvanized
or aluminum single
wall pipe, or 3” flexible
dryer vent

3” vent pipe:

Heat-Fab Saf-T Vent
Z-Flex Z-Vent II
Flex-L International StaR-34
ProTech Systems FasNSeal™

®

®

Vent starter must be
by same manufacturer
as the vent pipe.

87303

* furnished in kit

Fire stop

CGs boiler

Condensate drain line

4. Obtain vent system components

(continued)

Figure 5

Typical installation,
showing component
identification