Assemble block – Weil-McLain 80 User Manual

Page 6

background image

Weil-McLain 80 Boiler For Gas, Light Oil, Gas/Light Oil Fired Burners

6

Part No. 550-141-935/0602

Assemble block

3

Sections are top heavy. Unbolted sections
may fall if not supported, resulting in
severe personal injury or death.

Install back refractory blanket

1. Lay back section on floor with ports face up.
2. Apply adhesive to blanket.
3. Press blanket against back target wall as shown in

Figure 4.

4. Using knife, cut hole through blanket to expose

observation port opening.

Prepare back section

1. Apply

1

/

8

" continuous bead of sealing rope adhesive in

sealing rope grooves. See Figure 4. Do not get any
adhesive on machined port surfaces

.

2. Place ½" sealing rope in groove. Around curves, grasp

at 1" intervals and push together. Do not stretch.

Do not pre-cut rope. Gas tight seal must
be maintained to prevent possibility of
flue gas leakage and carbon monoxide
emissions, causing severe personal injury
or death.

3. Remove any grit from port machined surfaces with

clean rag.

Figure 4

Sealing rope installation

Figure 5

Silicone sealant

Do not use petroleum-based cleaning or
sealing compounds in boiler system.
Severe damage to system components can
result, causing substantial property
damage.

4. Place 7½" and 3½" sealing rings in appropriate port

openings. See Figure 4. If sealing ring slips out of groove,
stretch ring gently for several seconds, then reposition
in groove.

5. Apply continuous bead of silicone sealant no larger than

1

/

16

" around entire outside edge of outer machined

surface of port. Refer to Figure 5. Do not apply
silicone sealant on, next to or under sealing ring

.

Silicone sealant applied as specified above
prevents unburned oil vapors from
coming in contact with sealing ring. Vapor
contact can damage rings, resulting in
severe damage to boiler and substantial
property damage.

6. Position section upright on foundation (if used) and

screw 3" pipe at least 22" long into 3" return tapping.

7. Place a block under pipe to hold section upright.