beautypg.com

Connect steam boiler piping – Weil-McLain 80 User Manual

Page 17

background image

• Installation • Start-Up • Maintenance • Parts

17

Part No. 550-141-935/0602

Connect steam boiler piping

(continued)

8

Figure 15 Model 380 through 580 steam boiler piping — NOTE

minimum 24 inches between boiler water line and bottom

of header.

Figure 16 Model 680 through 980 steam boiler piping — NOTE

minimum 24 inches between boiler water line and bottom

of header.