Installation, Eg, peg, egh g, 4 — b – Weil-McLain EG User Manual
Page 7
Part Number 550-110-639/0703
7
EG, PEG, EGH G
AS
-
FIRED
B
OILERS
—
SERIES
4 — B
OILER
M
ANUAL
Installation
(continued)
1
Installation of drawer assembly
and front access panel and back
base channel
(Factory installed on PEG boilers - follow
steps 2 and 3)
1. The drawer assembly consists of the burner drawer,
main burners, gas manifold, pilot burner, etc. See
Figures 6, 7 and 8 for installation.
2. Check for proper orifice sizing from chart below.
Proper orifices must be used. Failure to do
so will cause severe personal injury, death
or substantial property damage.
3. Level and straighten burners.
Burners must be properly seated in slots in
back burner support with openings facing
up. Gas orifices must inject down center of
burner. Failure to properly seat burners
will result in severe personal injury, death
or substantial property damage.
4. Install front access panel and back base channel. See
Figure 9.
5. Install rollout thermal fuse element with wire
terminals facing up on front access panel of EG 30-75
boilers only as shown in Figure 9. Wire per Control
Supplement.
Figure 5
Front and back base panels
Figure 9
Access panel
Figure 8
Burner drawer installation
Figure 7
Pilot burner location
Figure 6
Burner drawer assembly