beautypg.com

Cable #5 – Vision Fitness Multi-Station Gym ST710 User Manual

Page 21

background image

AA

FF

EE CC

DD

BB

21

11

STEP

Remove the slotted bolt and nut from the end
of the cable. Route this end through the
following pulleys in the specified order: Up
through the center of the leg press overhead
tube, over pulley BB, over CC, down
through the center of the tube, under floating
pulley DD, over EE, and under the front of
FF. Reattach the slotted bolt and nut and
thread a minimum of 0.5” into floating pulley
AA. Tighten the nut against the receiving
post. WARNING: Failure to thread the
end in the specified distance can result
in serious injur y!

CABLE #5