Trane GETB User Manual
Page 7

WSHP-SVN08B-EN
7
SWAGE 3" (76)
G
G
H
J
UNITS
WITH
T
OP DISCHARGE
ARE 80" (2032) IN HEIGHT
ALL O
THER UNITS
ARE 88" (2235) IN HEIGHT
FROM 96" (2438)
T
O
1
20" (3048)
2 1/2" (63.5)
E
F
DRAIN
CONNECTION
D
4 3/4"
(121)
60" (1
524)
3/4" (19) O.D.
CHASSIS
ACCESS
PANEL
THROWAWAY
FILTER
CONTROL BOX
C
LOW VOLTAGE
CONNECTION BOX
FOR THERMOSTAT
SUPPLY-AIR
OPENING
1 1/4" (32)
1/2" (12.7) O.D.
ELECTRIC CONDUIT
1" (25.4)
1"
(25.4)
B
A
1" (25.4)
3 3/4"
(95)
8" (203)
1
2
1/2"
(31
8)
3 3/4"
(95)
8" (203)
12 1/2"
(318)
RETURN
SUPPLY
DRAIN
OPTIONAL
DUCT OPENING
1" (12.7) DUCT
COLLAR
R
S
D
VARIES DEPENDENT
ON RISER O.D.
TOP
FRONT
RIGHT SIDE
11" (279) FOR 80" (2032) CABINET HEIGHT
3" (76) FOR 88" (2235) CABINET HEIGHT
SUPPLY-AIR OPENINGS AND RISER LOCATIONS CANNOT
BE ON THE SAME SIDE OF THE UNIT.
RISER LOCATION CAN BE ON ANY SIDE EXCEPT FRONT,
AND MAY BE SUPPLIED BY TRANE OR BY OTHERS.
NOTE:
RIGHT RISER
LOCATION SHOWN
IN FRONT AND RIGHT
VIEWS.
RISER CONNECTION
1/2” (13) NPTE = 009-018
3/4” (19) NPTE = 024,036
Dimensions
GET 009-036
GET
A
B
C
D
E
F
009, 012
16 1/4" (413)
16 1/4" (413)
8 1/8" (206)
39 1/8" (994)
14 3/4" (375)
3/4" (19)
015-018
18" (457)
20" (508)
10" (254)
40 5/8" (1032) 18 3/4" (476)
3/4" (19)
024-036
24" (610)
24" (610)
12" (305)
49 5/8" (1260) 22 5/8" (575)
3/4" (19